Availability
--
run time / planned time
Performance
--
ideal time / run time
Quality
--
good parts / all parts
OEE
--
A × P × Q
--
Where this shift's time went (seconds; a shift is eight minutes here)
The line now
--
product--
ideal cycle (master data)--
parts this shift--
bad parts (of them in startup)--
minor stops--
counter registers (wrap at 65536)--
This shift (stops longer than the minor-stop limit)
| # | at | s | why |
|---|
Downtime by reason
Finished shifts (from log\oee.db)
| shift | start | A | P | Q | OEE | good |
|---|
The machine (LINE/S00 - the bench, not the MES: make things happen)
0 = never. The machine made -- parts since it started, -- of them bad - what the MES counts should add up to that.